Skip to contentDEMOThis site is a showcase demo built by Briefikir. Contact us for your company website

Car-park deck coating and repair

Kartal shopping centre car park

Leaks and spalling were fixed across a three-level car park and ramps made slip-resistant.

Kartal shopping centre car park
Location
İstanbul · Kartal
Building / client
Mall / car park · Shopping centre operator
Area
14.800 m²
Duration
60 working days
Year
2024
System
R4 concrete repair + anti-slip epoxy + joint details

Water leaking from the upper level had corroded the rebar and caused spalling on some beams. Work was done on night shifts, closing one section at a time without shutting the car park.

After repairs, coarse-quartz epoxy went on the ramps and medium-grade on the decks. Bays, arrows and walkways were repainted.

Location (province level)

Service page: Car-park deck coating and repair Request a survey for a similar job

Products used

MB-FX-PM

Fixor PU 25 Polyurethane Sealant

Construction chemicals · Sealants

Coverage
10 × 10 mm derzde ~6 m / 600 ml
Pack
600 ml sausage (≈6 m of 10 × 10 mm joint)

Similar projects