MB-CP-KR
Çimpro Crystalline Waterproofing
Waterproofing · Cementitious
- Coverage
- 1,2–1,8 kg/m² (iki kat)
- Pack
- 25 kg bag

Waterproofing
Interior crystalline and cementitious systems for damp and leaking basements that cannot be excavated.

Process
Our technical team measures moisture on site, inspects existing layers and details, takes dimensions and photos.
Damp render is removed to a sound base and at least 50 cm above the damp line.
Leaking cracks and points are opened and plugged; fillets are formed at corners.
Crystalline or negative-side mortar is applied in two coats as appropriate and moist-cured.
Finished with breathable render and mineral paint.
At completion we carry out a water test or visual inspection and hand over a photo report and written warranty certificate.
MB-CP-KR
Waterproofing · Cementitious
MB-CP-NG
Waterproofing · Cementitious
With proper preparation it lasts long, though the wall itself stays wet. External waterproofing remains the first choice where possible.
Moisture meters and surface temperature readings distinguish them; condensation usually appears in winter and in corners.
Yes, breathable mineral or silicate paints are recommended; plastic emulsions may trap moisture.