MB-AS-GA
Astarix General-Purpose Acrylic Primer
Construction chemicals · Primers
- Coverage
- 0,10–0,20 kg/m²
- Pack
- 10 kg jerrycan

Flooring
Epoxy floors resisting forklifts and chemicals in factories, warehouses and labs — including joints, repairs and levelling.

Process
Our technical team measures moisture on site, inspects existing layers and details, takes dimensions and photos.
Based on the survey we prepare a written quote with the system and layer-by-layer materials and labour.
The floor is shot-blasted, cracks and pits repaired and moisture measured.
Primer, levelling and two epoxy coats are applied; joints sealed.
After curing, pedestrian and forklift routes are line-marked.
At completion we carry out a water test or visual inspection and hand over a photo report and written warranty certificate.
MB-AS-GA
Construction chemicals · Primers
MB-FX-KSNew
Construction chemicals · Repair & screeds
MB-BS-EK
Anti-slip floors & stairs · Anti-slip coating
MB-FX-PM
Construction chemicals · Sealants
Areas can be phased over weekends and shift breaks.
Epoxy is hard and chemical-resistant; PU systems are preferred where thermal shock or UV occur.
Usually after 72 hours; full chemical resistance develops in 7 days.
Projects