Skip to contentDEMOThis site is a showcase demo built by Briefikir. Contact us for your company website
Industrial floor coating

Flooring

Industrial floor coating

Epoxy floors resisting forklifts and chemicals in factories, warehouses and labs — including joints, repairs and levelling.

When do you need it?

  • The concrete floor dusts and wears
  • Hygiene is required in food, pharma or electronics
  • Oil and chemical spills cannot be cleaned
  • A new warehouse or production area is opening

Layer build-up

Industrial floor coating
  1. 5Joint sealantMovement jointsView product →
  2. 4Epoxy coatingTwo coatsView product →
  3. 3LevellingThin screedView product →
  4. 2PrimerBinds dustView product →
  5. 1Concrete floorShot-blasted or ground
Layers are listed bottom-up; details are finalised per project after survey.

Process

Step by step

  1. 01Survey and measurement

    Our technical team measures moisture on site, inspects existing layers and details, takes dimensions and photos.

  2. 02System selection and quote

    Based on the survey we prepare a written quote with the system and layer-by-layer materials and labour.

  3. 03Surface preparation

    The floor is shot-blasted, cracks and pits repaired and moisture measured.

  4. 04Coating

    Primer, levelling and two epoxy coats are applied; joints sealed.

  5. 05Curing and marking

    After curing, pedestrian and forklift routes are line-marked.

  6. 06Inspection and handover

    At completion we carry out a water test or visual inspection and hand over a photo report and written warranty certificate.

Products in this system

MB-FX-KSNew

Fixor Self-Levelling Screed

Construction chemicals · Repair & screeds

Coverage
1,7 kg/m²/mm (5 mm için ~8,5 kg/m²)
Pack
25 kg bag

MB-FX-PM

Fixor PU 25 Polyurethane Sealant

Construction chemicals · Sealants

Coverage
10 × 10 mm derzde ~6 m / 600 ml
Pack
600 ml sausage (≈6 m of 10 × 10 mm joint)

FAQ

Can work proceed without stopping production?

Areas can be phased over weekends and shift breaks.

Epoxy or polyurethane?

Epoxy is hard and chemical-resistant; PU systems are preferred where thermal shock or UV occur.

When can forklifts drive on it?

Usually after 72 hours; full chemical resistance develops in 7 days.

Projects

Recent jobs

All projects