Skip to contentDEMOThis site is a showcase demo built by Briefikir. Contact us for your company website

Balcony waterproofing

Bornova housing estate balcony waterproofing

96 balconies dripping and staining those below were re-waterproofed together with concrete repairs.

Bornova housing estate balcony waterproofing
Location
İzmir · Bornova
Building / client
Residential · Estate management (96 balconies)
Area
860 m²
Duration
30 working days
Year
2025
System
Hybrid liquid membrane + C2TE tiling

Most balconies had no waterproofing under the tiles, fell inwards and showed spalling at the edges. Each flat was scheduled by appointment and balconies were handled in turn.

After strip-out, edges were repaired with R4 mortar and an outward-falling screed with drip profile was laid. The odourless hybrid membrane let flats stay occupied, and every balcony was flood-tested before tiling.

Location (province level)

Service page: Balcony waterproofing Request a survey for a similar job

Products used

Similar projects