Skip to contentDEMOThis site is a showcase demo built by Briefikir. Contact us for your company website

Bathroom, kitchen and wet-area waterproofing

Yalova thermal hotel wet-area renovation

120 en-suite bathrooms were renovated floor by floor with an odourless hybrid system while the hotel stayed open.

Yalova thermal hotel wet-area renovation
Location
Yalova · Termal
Building / client
Hotel · Thermal hotel operator
Area
1.850 m²
Duration
45 working days
Year
2023
System
Hybrid liquid membrane + C2TE + epoxy grout (120 bathrooms)

The heat and minerals of the thermal water had eroded old grout and caused ceiling stains below. Work proceeded one floor at a time without closing the hotel.

The odourless hybrid membrane let neighbouring rooms stay in use. Showers got epoxy grout and every bathroom passed a 24-hour flood test.

Location (province level)

Service page: Bathroom, kitchen and wet-area waterproofing Request a survey for a similar job

Products used

Similar projects