Pool and water tank waterproofing

Bodrum boutique hotel pool waterproofing

A pool losing water was fully re-waterproofed with new mosaics before the season.

Bodrum boutique hotel pool waterproofing
Location
Muğla · Bodrum
Building / client
Hotel · Boutique hotel operator
Area
640 m²
Duration
18 working days
Year
2024
System
Crystalline + cementitious pool system + epoxy grout

The pool was losing several centimetres a day; a dye test traced the leak to skimmers and light fittings. Mosaics were removed and the shell water-jetted.

Penetrations were detailed with tape and plugging mortar, then crystalline and flexible coats applied. Mosaic was laid with epoxy grout and the pool filled a week before opening.